Details
-
Bug
-
Status: Resolved
-
Resolution: Done
-
unspecified
-
None
-
None
-
Operating System: All
Platform: All
-
3176
-
Normal
Description
Switches should not be in READY state until EPs are associated with it.
Alternatively, keep a switch as READY using the current criteria and add ACTIVE state for when EP is associated. This stops flows being added to non-GBP switches which have controller set.