Uploaded image for project: 'groupbasedpolicy'
  1. groupbasedpolicy
  2. GBP-31

Switch should not go to READY state until EP associated

    XMLWordPrintable

Details

    • Bug
    • Status: Resolved
    • Resolution: Done
    • unspecified
    • None
    • General
    • None
    • Operating System: All
      Platform: All

    • 3176
    • Normal

    Description

      Switches should not be in READY state until EPs are associated with it.

      Alternatively, keep a switch as READY using the current criteria and add ACTIVE state for when EP is associated. This stops flows being added to non-GBP switches which have controller set.

      Attachments

        No reviews matched the request. Check your Options in the drop-down menu of this sections header.

        Activity

          People

            alagalah Keith Burns
            alagalah Keith Burns
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: