Details
-
Task
-
Status: Verified
-
High
-
Resolution: Done
-
None
-
None
-
None
Description
Currently Genius CSIT runs with two switches(OVS).
But with Open flow based tunnels in picture the tunnel counts will get reduced.
Hence the needed checks for OFT can be done properly only if there are a minimum of three switches.
Therefore enhancing genius csit to use 3 switches.
Attachments
Issue Links
- clones
-
GENIUS-128 Change Feature Title (add topic tag, keep in parenthesis)
-
- In Progress
-
There are no Sub-Tasks for this issue.