Uploaded image for project: 'genius'
  1. genius
  2. GENIUS-19

long delays between vm boot and flow installation

    XMLWordPrintable

Details

    • Bug
    • Status: Resolved
    • Resolution: Done
    • (unspecified)
    • None
    • General
    • None
    • Operating System: All
      Platform: All

    • 6689

    Description

      Causes DHCP failures.

      Attaching openflow protocol pcap that indicates the amount of time between the VM port creation and the first flow install to table=0.

      Also attaching ODL log.

      Attachments

        No reviews matched the request. Check your Options in the drop-down menu of this sections header.

        Activity

          People

            tali@hpe.com Tali Ben-Meir
            koby.aizer@hpe.com Koby Aizer
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: