Uploaded image for project: 'transportpce'
  1. transportpce
  2. TRNSPRTPCE-149

verification of output power levels

    XMLWordPrintable

Details

    • Improvement
    • Status: Open
    • Medium
    • Resolution: Unresolved
    • None
    • None
    • None
    • None

    Description

      This is related to TRNSPRTPCE-88 where it was discussed what to do after setting the power level on an interface when creating a connection. Currently TransportPCE just waits for a fixed time before changing control mode from Power to GainLoss. But the OpenROADM whitepaper states that as a final step the controller should verify "that the output power reaches the set value (verify pmParameterName/type = opticalPowerOutput)". Do I understand correctly that the current implementation is not really compliant with the OpenROADM specification?

      Attachments

        No reviews matched the request. Check your Options in the drop-down menu of this sections header.

        Activity

          People

            Unassigned Unassigned
            ojnas Jonas Mårtensson
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated: