[FAAS-29] L2 connectivity has to be programmed across multiple fabrics Created: 24/May/16  Updated: 31/Aug/16  Resolved: 31/Aug/16

Status: Resolved
Project: faas
Component/s: General
Affects Version/s: unspecified
Fix Version/s: None

Type: Bug
Reporter: xingjun chu Assignee: Henry Yu
Resolution: Done Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified
Environment:

Operating System: All
Platform: All


External issue ID: 5958

 Description   

When end points are distributed over multiple fabrics, multiple Logical switches have to be created and those logical switches have to be connected into a bigger logical switch.


Generated at Wed Feb 07 19:58:59 UTC 2024 using Jira 8.20.10#820010-sha1:ace47f9899e9ee25d7157d59aa17ab06aee30d3d.