[GBP-31] Switch should not go to READY state until EP associated Created: 12/May/15 Updated: 15/May/15 Resolved: 15/May/15 |
|
| Status: | Resolved |
| Project: | groupbasedpolicy |
| Component/s: | General |
| Affects Version/s: | unspecified |
| Fix Version/s: | None |
| Type: | Bug | ||
| Reporter: | Keith Burns | Assignee: | Keith Burns |
| Resolution: | Done | Votes: | 0 |
| Labels: | None | ||
| Remaining Estimate: | Not Specified | ||
| Time Spent: | Not Specified | ||
| Original Estimate: | Not Specified | ||
| Environment: |
Operating System: All |
||
| External issue ID: | 3176 |
| Priority: | Normal |
| Description |
|
Switches should not be in READY state until EPs are associated with it. Alternatively, keep a switch as READY using the current criteria and add ACTIVE state for when EP is associated. This stops flows being added to non-GBP switches which have controller set. |
| Comments |
| Comment by Keith Burns [ 15/May/15 ] |
|
REsolved. |