[GBP-31] Switch should not go to READY state until EP associated Created: 12/May/15  Updated: 15/May/15  Resolved: 15/May/15

Status: Resolved
Project: groupbasedpolicy
Component/s: General
Affects Version/s: unspecified
Fix Version/s: None

Type: Bug
Reporter: Keith Burns Assignee: Keith Burns
Resolution: Done Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified
Environment:

Operating System: All
Platform: All


External issue ID: 3176
Priority: Normal

 Description   

Switches should not be in READY state until EPs are associated with it.

Alternatively, keep a switch as READY using the current criteria and add ACTIVE state for when EP is associated. This stops flows being added to non-GBP switches which have controller set.



 Comments   
Comment by Keith Burns [ 15/May/15 ]

REsolved.

Generated at Wed Feb 07 20:00:57 UTC 2024 using Jira 8.20.10#820010-sha1:ace47f9899e9ee25d7157d59aa17ab06aee30d3d.