[OPNFLWPLUG-606] He plugin: switch scalability CSIT failing to find links Created: 26/Jan/16 Updated: 27/Sep/21 Resolved: 31/Jan/16 |
|
| Status: | Resolved |
| Project: | OpenFlowPlugin |
| Component/s: | General |
| Affects Version/s: | None |
| Fix Version/s: | None |
| Type: | Bug | ||
| Reporter: | Jamo Luhrsen | Assignee: | Unassigned |
| Resolution: | Done | Votes: | 0 |
| Labels: | None | ||
| Remaining Estimate: | Not Specified | ||
| Time Spent: | Not Specified | ||
| Original Estimate: | Not Specified | ||
| Environment: |
Operating System: All |
||
| Attachments: |
|
| External issue ID: | 5106 |
| Description |
|
This switch scalability job is now failing to scale above aprox 200 switches the reason for failure is that a specific switch port is not discovered in the the test flow is to: start a mininet topo with 100 switches (linear) – increase by 100 and repeat checks. in one specific failure, the test at 200 switches passed. Then at 300 switches the The full karaf.log is attached, but this stood out to me: the CSIT job: |
| Comments |
| Comment by Jamo Luhrsen [ 26/Jan/16 ] |
|
Attachment karaf.log.xz has been added with description: karaf log from job/openflowplugin-csit-1node-periodic-scalability-daily-only-beryllium/272 |
| Comment by Luis Gomez [ 30/Jan/16 ] |
|
I think this is fixed with latest He changes, can you please check? |
| Comment by Jamo Luhrsen [ 31/Jan/16 ] |
|
(In reply to Luis Gomez from comment #1) yes, this is resolved. |