[TRNSPRTPCE-629] Combine OTU (OTUCn) infrastructure service with ODU (ODUCn) infrastructure Created: 02/Mar/22 Updated: 16/Jan/24 |
|
| Status: | Open |
| Project: | transportpce |
| Component/s: | None |
| Affects Version/s: | None |
| Fix Version/s: | None |
| Type: | Story | Priority: | Medium |
| Reporter: | Balagangadhar Bathula | Assignee: | Unassigned |
| Resolution: | Unresolved | Votes: | 0 |
| Labels: | None | ||
| Remaining Estimate: | 1 week, 3 days | ||
| Time Spent: | Not Specified | ||
| Original Estimate: | 1 week, 3 days | ||
| Description |
|
Currently we have a three step process to create a sub-wavelength services (1G, 10G, 100G, 200G, and 300G).
However, as of now we did not find a use-case to have OTU and ODU service creation separately. Also, we found the the PM values are unavailable until the creation of the respective ODU service, without which we cannot perform OLM and calculate preFEC BER. Either we combine Step (1) and (2) and make the process a two-step process instead of (3) or preform OLM/ BER calculations after the creation ODU service. Preferred option would be make it a two-step process.
|