Uploaded image for project: 'controller'
  1. controller
  2. CONTROLLER-1845

Karaf takes 7 minutes to start

    XMLWordPrintable

Details

    • Bug
    • Status: Resolved
    • Lowest
    • Resolution: Done
    • None
    • None
    • karaf
    • None

    Description

      I've been running the ODL Clustering CSIT job from stable/oxygen and analyzing failures, as part of the clustering stabilization effort.

      During one of these runs, the cluster fails to go to sync status after ODL is restarted (Tell based False). I looked at the node that failed to sync, and see that karaf took just a little over 7 minutes to start up for this test case.

       

      Here are the relevant karaf logs:

       

      Jun 29, 2018 3:43:47 PM org.apache.karaf.main.Main launch
      INFO: Installing and starting initial bundles
      Jun 29, 2018 3:43:47 PM org.apache.karaf.main.Main launch
      INFO: All initial bundles installed and set to start
      Jun 29, 2018 3:43:47 PM org.apache.karaf.main.lock.SimpleFileLock lock
      INFO: Trying to lock /tmp/karaf-0.8.3-SNAPSHOT/lock
      Jun 29, 2018 3:43:47 PM org.apache.karaf.main.lock.SimpleFileLock lock
      INFO: Lock acquired
      Jun 29, 2018 3:43:47 PM org.apache.karaf.main.Main$KarafLockCallback lockAquired
      INFO: Lock acquired. Setting startlevel to 100
      Jun 29, 2018 3:50:48 PM org.apache.karaf.main.Main launch
      INFO: Installing and starting initial bundles
      Jun 29, 2018 3:50:49 PM org.apache.karaf.main.Main launch
      INFO: All initial bundles installed and set to start
      Jun 29, 2018 3:50:49 PM org.apache.karaf.main.lock.SimpleFileLock lock
      INFO: Trying to lock /tmp/karaf-0.8.3-SNAPSHOT/lock
      Jun 29, 2018 3:50:49 PM org.apache.karaf.main.lock.SimpleFileLock lock
      INFO: Lock acquired
      Jun 29, 2018 3:50:49 PM org.apache.karaf.main.Main$KarafLockCallback lockAquired
      INFO: Lock acquired. Setting startlevel to 100

       

      I'll also attach the (annotated) karaf log.

       

       

       

       

      Attachments

        Issue Links

          # Subject Branch Project Status CR V

          Activity

            People

              sharmaarun Arun Sharma
              vpickard Victor Pickard
              Votes:
              1 Vote for this issue
              Watchers:
              11 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: